The economic and technical importance of specialized repair of boiler tubes and furnaces in Fars
Understanding boiler tubes and common damages in boiler tubes
1. Corrosion and oxidation
4. Thermal and Mechanical Fatigue
Technical steps of specialized boiler tube repair
Step 1: Initial Inspection and Diagnostics (NDT)
- Ultrasonic test (UT): to accurately measure the remaining thickness of the pipe wall.
- Penetrating liquids (PT) and magnetic particle (MT) test: To identify surface cracks at welds and tubesheet joints.
- Thickness measurement and visual inspection (VT): To check the amount of deformation, bellying or perforation Pipes.
Second stage: emptying, cutting and removing the worn pipes
The third step: preparing the tube sheet and the position of the tubes
The fourth stage: joining, waltzing and specialized welding
The fifth stage: hydrostatic test and operation
Troubleshooting and reconstruction of industrial furnaces in Fars province
Reconstruction of the refractory wall and brickwork of the furnace
Adjustment of ignition systems and burners
Valve equipment in the safety and performance of steam boilers
- Safety Valve: The most critical safety part of the boiler, which operates mechanically and releases excess pressure in case of a sudden rise in pressure.
- Level Control Valves: To accurately adjust the amount of water entering the boiler.
- Blowdown Valves: To drain sludge and sediments deposited in Bottom of the boiler.
- Check & Globe Valves: To manage steam and water flow.
Leading services: repair of steam boilers and valve equipment of Sepehr Industrial Group
1. Complete replacement and reconstruction of boiler tubes (Re-tubing)
2. Repair, turning and calibration of industrial valves
3. Refractory and insulation of industrial furnaces and boilers
4. Descaling and standard acid washing (Chemical Cleaning)
5. Inspection, issuance of health certificate and periodic overhaul
Preventive maintenance (PM) of boilers and furnaces
Summary and sustainable solution for the industries of Fars province